RUS  ENG JOURNALS   PEOPLE   ORGANISATIONS   CONFERENCES   SEMINARS   VIDEO LIBRARY   PERSONAL OFFICE
General information
Latest issue
Archive
Impact factor
Guidelines for authors
Submit a manuscript

Search papers
Search references

RSS
Latest issue
Current issues
Archive issues
What is RSS



Avtomat. i Telemekh.:
Year:
Volume:
Issue:
Page:
Find






Personal entry:
Login:
Password:
Save password
Enter
Forgotten password?
Register


Avtomat. i Telemekh., 2019, Issue 5, Pages 155–172 (Mi at15026)  

Optimization, System Analysis, and Operations Research

Aggregation in job-shop scheduling problems on facilities with conveyor assembly of finished products

E. N. Khobotova, M. A. Ermolovab

a Trapeznikov Institute of Control Sciences, Russian Academy of Sciences, Moscow, Russia
b Bauman State Technical University, Moscow, Russia

Abstract: We consider problem settings and methods of job-shop scheduling on mechanical engineering facilities whose production departments manufacture components, and the final products are assembled on conveyors. Job schedules are constructed both in terms of incoming orders for manufactured products and in terms of existing demand and storage costs at the company warehouses until the moment of sale.

Keywords: scheduling, aggregation methods, processing of parts, conveyor assembly of products, units, discrete production, warehouses, inventory management.

DOI: https://doi.org/10.1134/S000523101905009X

Full text: PDF file (843 kB)
First page: PDF file
References: PDF file   HTML file

English version:
Automation and Remote Control, 2019, 80:5, 913–926

Bibliographic databases:

Document Type: Article
Presented by the member of Editorial Board: A. A. Lazarev

Received: 29.03.2018
Revised: 10.10.2018
Accepted: 08.11.2018

Citation: E. N. Khobotov, M. A. Ermolova, “Aggregation in job-shop scheduling problems on facilities with conveyor assembly of finished products”, Avtomat. i Telemekh., 2019, no. 5, 155–172; Autom. Remote Control, 80:5 (2019), 913–926

Citation in format AMSBIB
\Bibitem{KhoErm19}
\by E.~N.~Khobotov, M.~A.~Ermolova
\paper Aggregation in job-shop scheduling problems on facilities with conveyor assembly of finished products
\jour Avtomat. i Telemekh.
\yr 2019
\issue 5
\pages 155--172
\mathnet{http://mi.mathnet.ru/at15026}
\crossref{https://doi.org/10.1134/S000523101905009X}
\elib{http://elibrary.ru/item.asp?id=37541644}
\transl
\jour Autom. Remote Control
\yr 2019
\vol 80
\issue 5
\pages 913--926
\crossref{https://doi.org/10.1134/S0005117919050096}
\isi{http://gateway.isiknowledge.com/gateway/Gateway.cgi?GWVersion=2&SrcApp=PARTNER_APP&SrcAuth=LinksAMR&DestLinkType=FullRecord&DestApp=ALL_WOS&KeyUT=000468031800009}
\scopus{http://www.scopus.com/record/display.url?origin=inward&eid=2-s2.0-85066103214}


Linking options:
  • http://mi.mathnet.ru/eng/at15026
  • http://mi.mathnet.ru/eng/at/y2019/i5/p155

    SHARE: VKontakte.ru FaceBook Twitter Mail.ru Livejournal Memori.ru


    Citing articles on Google Scholar: Russian citations, English citations
    Related articles on Google Scholar: Russian articles, English articles
  • Avtomatika i Telemekhanika
    Number of views:
    This page:17
    References:1
    First page:2

     
    Contact us:
     Terms of Use  Registration  Logotypes © Steklov Mathematical Institute RAS, 2019