|
Author Index, 2018
D. A. Novikov, see M. V. Belov Probl. Upr., 2018, Issue 4, 36–45
|
D. A. Novikov, see M. V. Belov Probl. Upr., 2018, Issue 5, 39–48
|
D. A. Novikov, see M. V. Belov Probl. Upr., 2018, Issue 1, 47–57
|
A. F. Tarakanov, see G. A. Vasil'ev Probl. Upr., 2018, Issue 5, 49–55
|
V. V. Tsyganov The correct adaptive mechanisms with identification Probl. Upr., 2018, Issue 2, 47–57
|
V. N. Afanas'ev, N. A. Matveeva Construction of control for nonlinear system with quasi-constant regulator parameters Probl. Upr., 2018, Issue 1, 37–46
|
S. V. Aksenov, see M. P. Silich Probl. Upr., 2018, Issue 1, 58–65
|
D. I. Babaev, A. G. Poletikin, V. G. Promyslov, M. Yu. Timofeev Managing the cybersecurity architecture of automated process control systems of nuclear power plants Probl. Upr., 2018, Issue 3, 47–55
|
N. A. Babushkina, E. A. Kuzina, A. A. Loos, E. V. Belyaeva Results of the antitumor viral vaccine introduction regimens study based on mathematical modeling Probl. Upr., 2018, Issue 4, 61–70
|
V. P. Bauer, A. A. Zatsarinny, N. I. Ilyin, K. K. Kolin, V. E. Lepskii, G. G. Malinetskii, A. N. Raikov, S. N. Sil'verstov Disruptive situational control Probl. Upr., 2018, Issue 5, 31–38
|
M. V. Belov, D. A. Novikov Foundations of the complex activity theory. Part 1. The structures of complex activity. Uncertainty and generation of complex activity Probl. Upr., 2018, Issue 4, 36–45
|
M. V. Belov, D. A. Novikov Foundations of the complex activity theory. Part 2. Life cycles of complex activity. Organization and management as a complex activity Probl. Upr., 2018, Issue 5, 39–48
|
M. V. Belov, D. A. Novikov Network active systems: planning and stimulation models Probl. Upr., 2018, Issue 1, 47–57
|
E. V. Belyaeva, see N. A. Babushkina Probl. Upr., 2018, Issue 4, 61–70
|
S. L. Blumin, G. S. Borovkova Application of analysis of finite fluctuations and reverse computations in control systems and decision support systems Probl. Upr., 2018, Issue 6, 29–34
|
A. S. Bogomolov, V. A. Ivashchenko, V. A. Kushnikov, A. F. Rezchikov, A. D. Tsvirkun, L. G. Tsesarskiy, L. Filimonyuk Modeling complex for critical events combinations analysis in aviation transport systems Probl. Upr., 2018, Issue 1, 74–79
|
G. S. Borovkova, see S. L. Blyumin Probl. Upr., 2018, Issue 6, 29–34
|
A. I. Chadaev, E. I. Tropova Improving the launch safety of the launch vehicle «Soyuz-2» by forecasting the fuel use in the multi-block first stage Probl. Upr., 2018, Issue 6, 83–84
|
N. P. Demenkov, E. A. Mikrin, I. A. Mochalov Fuzzy two-point boundary value problems in mathematical modeling and control. Part 1. Fuzzy mathematical modeling Probl. Upr., 2018, Issue 1, 30–36
|
N. P. Demenkov, E. A. Mikrin, I. A. Mochalov Fuzzy two-point boundary value problems in mathematical modeling and control. Part 2. Fuzzy control Probl. Upr., 2018, Issue 2, 31–39
|
N. A. Egorov, see G. S. Veresnikov Probl. Upr., 2018, Issue 5, 2–13
|
N. A. Egorov, see G. S. Veresnikov Probl. Upr., 2018, Issue 4, 2–13
|
L. Yu. Filimonyuk, see A. S. Bogomolov Probl. Upr., 2018, Issue 1, 74–79
|
A. A. Galyaev, P. V. Lysenko Minimum-time control problem for elastic and visco-elastic interaction between body and surface Probl. Upr., 2018, Issue 4, 14–20
|
M. V. Gorodnova, see A. M. Shevchenko Probl. Upr., 2018, Issue 2, 66–74
|
S. S. Granin, A. S. Mandel Optimization of inventory management process in a supply chain having alternative suppliers Probl. Upr., 2018, Issue 6, 24–28
|
E. B. Gribanova Algorithms of information diffusion modeling in marketing activities within the groups of online social network Probl. Upr., 2018, Issue 1, 66–73
|
V. B. Gusev Models of autonomous control in the developing systems Probl. Upr., 2018, Issue 6, 2–17
|
V. S. Hovsepyan, see A. M. Tsirlin Probl. Upr., 2018, Issue 4, 21–27
|
N. I. Il'in, see V. P. Bauer Probl. Upr., 2018, Issue 5, 31–38
|
N. N. Ivanov Generalized Stochastic Networks with Non-Standard Events Execution Disciplines Probl. Upr., 2018, Issue 5, 26–30
|
V. P. Ivanov, see V. K. Zavadskii Probl. Upr., 2018, Issue 4, 71–77
|
V. A. Ivaschenko, see A. S. Bogomolov Probl. Upr., 2018, Issue 1, 74–79
|
E. B. Kablova, see V. K. Zavadskii Probl. Upr., 2018, Issue 4, 71–77
|
N.M. Kartsev, see Yu. V. Mitrishkin Probl. Upr., 2018, Issue 1, 2–20
|
N.M. Kartsev, see Yu. V. Mitrishkin Probl. Upr., 2018, Issue 2, 2–30
|
V. G. Kazakov, see G. A. Vasil'ev Probl. Upr., 2018, Issue 5, 49–55
|
M. V. Khlebnikov, see Ya. I. Kvinto Probl. Upr., 2018, Issue 3, 2–7
|
L. G. Klenovaya, see V. K. Zavadskii Probl. Upr., 2018, Issue 4, 71–77
|
V. V. Klochkov, S. M. Rozhdestvenskaya Youth grants as a management tool for science development: effectiveness analysis Probl. Upr., 2018, Issue 3, 8–16
|
K. K. Kolin, see V. P. Bauer Probl. Upr., 2018, Issue 5, 31–38
|
P. S. Korenev, see Yu. V. Mitrishkin Probl. Upr., 2018, Issue 2, 2–30
|
P. S. Korenev, see Yu. V. Mitrishkin Probl. Upr., 2018, Issue 1, 2–20
|
E. L. Kulida, see G. S. Veresnikov Probl. Upr., 2018, Issue 4, 2–13
|
E. L. Kulida, see G. S. Veresnikov Probl. Upr., 2018, Issue 5, 2–13
|
V. A. Kushnikov, see A. S. Bogomolov Probl. Upr., 2018, Issue 1, 74–79
|
E. A. Kuzina, see N. A. Babushkina Probl. Upr., 2018, Issue 4, 61–70
|
N. A. Kuznetsov, see L. Yu. Zhilyakova Probl. Upr., 2018, Issue 3, 65–75
|
Ya. I. Kvinto, M. V. Khlebnikov Upper estimates of large deviations in linear systems in presence of uncertaint Probl. Upr., 2018, Issue 3, 2–7
|
V. G. Lebedev, see G. S. Veresnikov Probl. Upr., 2018, Issue 5, 2–13
|
V. G. Lebedev, see G. S. Veresnikov Probl. Upr., 2018, Issue 4, 2–13
|
V. E. Lepskii, see V. P. Bauer Probl. Upr., 2018, Issue 5, 31–38
|
A. A. Loos, see N. A. Babushkina Probl. Upr., 2018, Issue 4, 61–70
|
P. V. Lysenko, see A. A. Galyaev Probl. Upr., 2018, Issue 4, 14–20
|
R. V. Mayer Information-cybernetic approach to the study of didactic systems Probl. Upr., 2018, Issue 5, 66–72
|
G. G. Malinetskii, see V. P. Bauer Probl. Upr., 2018, Issue 5, 31–38
|
A. S. Mandel', see S. S. Granin Probl. Upr., 2018, Issue 6, 24–28
|
A. A. Manin, see S. V. Sokolov Probl. Upr., 2018, Issue 6, 73–82
|
N. A. Matveeva, see V. N. Afanasyev Probl. Upr., 2018, Issue 1, 37–46
|
V. G. Matyukhin, see L. Yu. Zhilyakova Probl. Upr., 2018, Issue 3, 65–75
|
M. Yu. Medvedev, see V. Kh. Pshikhopov Probl. Upr., 2018, Issue 6, 62–72
|
E. A. Mikrin, see N. P. Demenkov Probl. Upr., 2018, Issue 1, 30–36
|
E. A. Mikrin, see N. P. Demenkov Probl. Upr., 2018, Issue 2, 31–39
|
Yu. V. Mitrishkin, P. S. Korenev, A. A. Prokhorov, N. M. Kartsev, M. I. Patrov Plasma control in tokamaks. Part 1. Controlled thermonuclear fusion problem. Tokamaks. Control systems components Probl. Upr., 2018, Issue 1, 2–20
|
Yu. V. Mitrishkin, N. M. Kartsev, E. A. Pavlova, A. A. Prokhorov, P. S. Korenev, M. I. Patrov Plasma control in tokamaks. Part 2. Magnetic plasma control systems Probl. Upr., 2018, Issue 2, 2–30
|
I. A. Mochalov, see N. P. Demenkov Probl. Upr., 2018, Issue 1, 30–36
|
I. A. Mochalov, see N. P. Demenkov Probl. Upr., 2018, Issue 2, 31–39
|
A. A. Muranov The analysis of work of onboard terminal systems in monoblock liquid launch vehicles at the abnormal expenditure of fuel components Probl. Upr., 2018, Issue 5, 73–78
|
G. N. Nachinkina, see A. M. Shevchenko Probl. Upr., 2018, Issue 2, 66–74
|
M. I. Patrov, see Yu. V. Mitrishkin Probl. Upr., 2018, Issue 2, 2–30
|
M. I. Patrov, see Yu. V. Mitrishkin Probl. Upr., 2018, Issue 1, 2–20
|
E. A. Pavlova, see Yu. V. Mitrishkin Probl. Upr., 2018, Issue 2, 2–30
|
V. S. Podlazov Conflict-free self-routing for three-dimensional generalized hypercube Probl. Upr., 2018, Issue 3, 26–32
|
V. S. Podlazov Conflict-free self-routing for a three-dimensional complete multiring Probl. Upr., 2018, Issue 4, 54–60
|
A. G. Poletykin, see D. I. Babaev Probl. Upr., 2018, Issue 3, 47–55
|
S. S. Postnov Optimal control problems for certain linear fractional-order systems given by equations with Hilfer derivative Probl. Upr., 2018, Issue 5, 14–25
|
E. A. Postnova Optimal motion control of the system modeled by double integrator of fractional order Probl. Upr., 2018, Issue 2, 40–46
|
A. A. Prokhorov, see Yu. V. Mitrishkin Probl. Upr., 2018, Issue 1, 2–20
|
A. A. Prokhorov, see Yu. V. Mitrishkin Probl. Upr., 2018, Issue 2, 2–30
|
È. G. Prokhorova, see A. D. Tsvirkun Probl. Upr., 2018, Issue 3, 76–80
|
V. G. Promyslov, see D. I. Babaev Probl. Upr., 2018, Issue 3, 47–55
|
V. Kh. Pshikhopov, M. Yu. Medvedev Multi-loop adaptive control of mobile objects in solving trajectory tracking tasks Probl. Upr., 2018, Issue 6, 62–72
|
A. N. Raikov, see V. P. Bauer Probl. Upr., 2018, Issue 5, 31–38
|
L. B. Rapoport Application of the semi-definite relaxation method to the attitude determination of the rigid body Probl. Upr., 2018, Issue 5, 79–83
|
A. F. Rezchikov, V. A. Tverdokhlebov Method of recurrent and $Z$-recurrent control of complex system functioning Probl. Upr., 2018, Issue 3, 56–64
|
A. F. Rezchikov, see A. S. Bogomolov Probl. Upr., 2018, Issue 1, 74–79
|
S. M. Rozhdestvenskaya, see V. V. Klochkov Probl. Upr., 2018, Issue 3, 8–16
|
V. N. Rusev, A. V. Skorikov Approximations of the renewal function and operating costs management strategy Probl. Upr., 2018, Issue 4, 28–35
|
A. V. Ryapukhin, see Yu. V. Sidel'nikov Probl. Upr., 2018, Issue 6, 18–23
|
L. V. Sakharova, see S. V. Sokolov Probl. Upr., 2018, Issue 6, 73–82
|
A. B. Shabunin, see L. Yu. Zhilyakova Probl. Upr., 2018, Issue 3, 65–75
|
Z. I. Shalaginova Development of methods of quantitative substantiation of intermediate control units arrangement places in large heat supply systems Probl. Upr., 2018, Issue 6, 44–54
|
A. V. Shchepkin Cost-reducing funding mechanisms Probl. Upr., 2018, Issue 3, 17–25
|
A. B. Shelkov XXV international conference “The problems of complex systems security management” Probl. Upr., 2018, Issue 2, 75–79
|
A. M. Shevchenko, G. N. Nachinkina, M. V. Gorodnova Efficient algorithms development for predicting the braking mode of the aircraf Probl. Upr., 2018, Issue 2, 66–74
|
B. A. Shishov Cognitive load estimation on the basis of video information using recurrent neural networks Probl. Upr., 2018, Issue 2, 58–65
|
A. S. Shvedov Functions approximating by neural networks and fuzzy systems Probl. Upr., 2018, Issue 1, 21–29
|
Yu. V. Sidelnikov, A. V. Ryapukhin Improving the effectiveness of meetings in small groups. Part 1. Traditional approaches to the problem Probl. Upr., 2018, Issue 6, 18–23
|
M. P. Silich, V. A. Silich, S. V. Axyonov Methods of hierarchical hybrid cognitive map factors estimation on the example of assessment of energy consumption in regions Probl. Upr., 2018, Issue 1, 58–65
|
V. A. Silich, see M. P. Silich Probl. Upr., 2018, Issue 1, 58–65
|
S. N. Sil'verstov, see V. P. Bauer Probl. Upr., 2018, Issue 5, 31–38
|
V. O. Sirotyuk Formalized models and methods for analyzing and assessing the completeness of patent information funds (using the example of an international patent organization) Probl. Upr., 2018, Issue 6, 35–43
|
A. V. Skorikov, see V. N. Rusev Probl. Upr., 2018, Issue 4, 28–35
|
S. V. Sokolov, L. V. Sakharova, A. A. Manin Stochastic control of the maneuver to bypass the group of the moving spatial domains Probl. Upr., 2018, Issue 6, 73–82
|
S. K. Somov Creation of information-technological reserve in distributed data processing systems Probl. Upr., 2018, Issue 3, 40–46
|
S. K. Somov The problem of the optimal placing of the information-technological backup in distributed data processing systems Probl. Upr., 2018, Issue 4, 46–53
|
G.G. Stetsyura Network information-computing support of automatic mobile objects interaction Probl. Upr., 2018, Issue 5, 56–65
|
A. K. Takmaz'yan, see L. Yu. Zhilyakova Probl. Upr., 2018, Issue 3, 65–75
|
M. Yu. Timofeev, see D. I. Babaev Probl. Upr., 2018, Issue 3, 47–55
|
E. I. Tropova, see A. I. Chadaev Probl. Upr., 2018, Issue 6, 83–84
|
L. G. Tsesarskiy, see A. S. Bogomolov Probl. Upr., 2018, Issue 1, 74–79
|
A. M. Tsirlin, V. S. Hovsepyan Robust stability and selection of regulators settings for technological objects with delay Probl. Upr., 2018, Issue 4, 21–27
|
Yu. M. Tsodikov Successive linear programming method efficiency in solving the problems of production planning at oil refinery Probl. Upr., 2018, Issue 6, 55–61
|
A. D. Tsvirkun, see A. S. Bogomolov Probl. Upr., 2018, Issue 1, 74–79
|
A. D. Tsvirkun, E. G. Prokhorova The 10th international conference “Management of large-scale system development MLSD'2017” Probl. Upr., 2018, Issue 3, 76–80
|
V. A. Tverdokhlebov, see A. F. Rezchikov Probl. Upr., 2018, Issue 3, 56–64
|
G. A. Vasiliev, V. G. Kazakov, A. F. Tarakanov Game-theoretical modeling of confrontation between the parties based on the reflexive control Probl. Upr., 2018, Issue 5, 49–55
|
V. A. Vedeshenkov Method of controlling test construction for digital systems with minimal quasicomplete graph structure (on example of graph by dimension $11\times 11$) Probl. Upr., 2018, Issue 3, 33–39
|
G. S. Veresnikov, N. A. Egorov, E. L. Kulida, V. G. Lebedev Methods for solving of the aircraft landing problem. Part 1. Exact solution methods Probl. Upr., 2018, Issue 4, 2–13
|
G. S. Veresnikov, N. A. Egorov, E. L. Kulida, V. G. Lebedev Methods for solving of the aircraft landing problem. P. 2. Approximate solution methods Probl. Upr., 2018, Issue 5, 2–13
|
A. A. Zatsarinnyi, see V. P. Bauer Probl. Upr., 2018, Issue 5, 31–38
|
V. K. Zavadsky, V. P. Ivanov, E. B. Kablova, L. G. Klenovaya Integration of the flow and level measurement information for propellant consumption control systems Probl. Upr., 2018, Issue 4, 71–77
|
L. Yu. Zhilyakova, N. A. Kuznetsov, V. G. Matiukhin, A. B. Shabunin, A. K. Takmaz'yan Locomotive assignment graph model for freight traffic on linear section of railway. The problem of finding a maximal independent schedule coverage Probl. Upr., 2018, Issue 3, 65–75
|
|
|